Frog_Logo

Tipton Environmental International Inc.

Your Online Source for Packaged Wastewater Treatment Systems and Equipment

Swan Logo

 

 

Electrical Control Panels

Blower operation controls operation method: Each blower for the aeration chamber shall be controlled by the 24-hour, 7-day time clock and shall be capable of being programmed to control the blower run cycle and to adjust both the start set point every 15 minutes on the 24 hour cycle. The clock also includes a skip-a-day feature which will allow a separate program. The clock shall be by Paragon,Model #1015. A Selector switch will be provided with off and on time clock operation.

Control Panel
Control Panel
Control Panel
Control Panel

Control Panel

Control Panel

Control Panel

Tipton Environmental International, Inc.

4446 State Route 132

Batavia, Ohio 45103, USA

Phone- (513)-735-2777

Fax- (513)-735-1485

E-Mail- Info@tiptonenv.com